

Chiller replacement at The Chancery
Client: Cambridge Maintenance
Sector: Commercial Property Management
Project Focus: Chiller Replacement (Roof-Mounted System)
Location: The Chancery, Manchester
Service & technical partners

The brief
The ageing York chiller at The Chancery (installed approximately 20 years ago) was experiencing frequent faults, with no spare parts available. SK Heating & Cooling were tasked with surveying the system, calculating the required capacity, and proposing a replacement solution that would integrate with existing pipework.
The solution
Following detailed surveys and load assessments, SK Heating & Cooling selected a Daikin chiller and Dutypoint pump set to match the system requirements. After winning the competitive tender, SK managed a complex removal and installation process, including road closures and crane lifts.
The benefits
The client now benefits from a modern, efficient cooling system, reduced risk of breakdowns, increased ease of maintenance with readily available spare parts, improved building comfort, and a fully compliant installation, all completed within a short timeframe with minimal disruption to the surrounding area.






The business challenge
The original York chiller at The Chancery had been operating well beyond its intended service life. Frequent faults were becoming costly, and sourcing spare parts was no longer viable. Cambridge Maintenance needed a reliable replacement that would match the existing system’s load without requiring a full system redesign. Space constraints on the 7th floor rooftop and access challenges added complexity to the project delivery.
Our solution
SK Heating & Cooling carried out extensive system surveys and capacity calculations to ensure a like-for-like replacement could be achieved. A Daikin chiller was selected for its efficiency and compatibility, alongside a Dutypoint pump set for circulation.
Key works included:
- Isolation and draining of the existing chilled water system
- Replacement of a previously split frost coil within the AHU (and re-fitting in situ)
- Removal and safe disposal of the old York chiller, requiring dismantling into sections
- Careful planning of a crane lift operation, including road closures across three roads in a registered lifting plan
- Removal of the existing chiller unit and all ancillaries from the rooftop
- Installation of a new steel skid and new chiller within tight rooftop constraints
- Prefabrication and on-site assembly of new external pipework and DRV isolation valves
- System pressure testing, glycol dosing, and commissioning with Daikin engineer
All works were carefully phased and coordinated to minimise disruption to the client and surrounding area.
Installation photos
The outcome
Operational improvements
The building now benefits from significantly improved operational performance. With the new Daikin chiller in place, cooling is reliable and efficient, reducing the risk of system failures and providing a stable environment for occupants throughout the year.
Energy and cost savings
Energy and cost efficiency have also been improved. The modern chiller offers optimised energy use compared to the outdated York unit, helping to reduce the building’s ongoing running costs while also supporting sustainability targets.
Compliance and safety improvements
The project ensured full compliance with current F-Gas regulations and health and safety standards. By upgrading to a compliant system, Cambridge Maintenance can be confident that they are meeting all necessary legal and environmental responsibilities.
Staff and customer comfort
Staff, tenants, and visitors at The Chancery now enjoy enhanced comfort across the building, particularly during peak summer months, with improved temperature control and consistent cooling.
Future-proofed system
The upgraded system provides a future-proofed solution. With modern equipment, ease of maintenance, and a reliable service life ahead, the facilities management team have peace of mind that the cooling infrastructure will continue to perform well into the future.
The benefits
- Improved system reliability with modern chiller and pump set
- Increased energy efficiency and lower operational costs
- Full compliance with current building and environmental standards
- Successful management of complex crane operations with minimal disruption
- Future-proofed cooling system
- Enhanced staff and occupant comfort levels






Technical specification
Equipment installed
- Daikin air-cooled chiller.
- Dutypoint circulation pump set.
Location
7th floor rooftop at The Chancery, 58 Spring Gardens, Manchester M2 1EW.
Project timeline
15-week lead time for chiller delivery; installation completed within project programme.
Rooftop chiller and ancillary removal, and new chiller installation, successfully completed in one day through a carefully coordinated crane lift operation.
Scope of works
Isolation and draining of the existing chilled water system, complete chiller and pump set replacement, frost coil repair, dismantling and removal of the existing chiller and ancillaries, crane lift of new skid and chiller, prefabrication and assembly of new pipework, pressure testing, glycol dosing, and full commissioning by Daikin.
Controls/monitoring
System regulation and measurement integrated to ensure optimised performance.
Compliance standards
Health & Safety Executive (HSE) regulations for lifting operations, F-Gas compliance achieved.
Service & technical partners


Next steps
Interested in upgrading your building’s cooling systems or planning a critical replacement project?
Contact the SK Heating & Cooling Team to discuss your requirements.
Call: 01452 410500
Email: sales@skheatingandcooling.co.uk / service@skheatingandcooling.co.uk
Address: SK Heating and Cooling Ltd, 229 Bristol Road, Gloucester, GL1 5TL
Share This Story!
Do you have an upcoming project or tender? Then please complete the form below.








